![cutting room floor band cutting room floor band](https://s3.amazonaws.com/assets.imposemagazine.com/wp-content/uploads/2015/04/4-Little-Waist-walter-wlodarczyk-2015-04-05-0021.jpg)
Marking Grain Line: Before marker making, the grain line of pattern and fabric must be marked.In Divine Textiles Limited these processes are followed strictly: Marker width is equal to the minimum fabric width and its length depends on the no of pattern sizes that will be drawn.īefore the marker making, some preparatory processes would be followed. Marker may be on fabric or held in computer data files. The marker is placed on the material and provides guideline for cutting. The representation or drawing of the arrangement of identified garment pattern relevant to the cutting of a batch material. Marker is a thin paper which contains all necessary pattern pieces for all sizes for a particular style of garments in such a way that, fabric wastage would be least.
![cutting room floor band cutting room floor band](https://www.timothyoulton.com/pub/media/magefan_blog/timothy-oulton-mcintosh-wom-new-york-saddle-chair-stool.jpg)
This may be done by drawing the pattern pieces on the fabric directly or by drawing the pattern pieces on a thin marker paper and then placement the paper onto the fabric lay. This is a process which is performed to draw the pattern pieces on the fabric before cutting.
![cutting room floor band cutting room floor band](https://ninecirclesblog.files.wordpress.com/2021/09/595601.jpg)
In Divine Textiles Limited there is a strong team working for marker making in cutting section of each floor. If everything is ok, then the approval is given and the fabric is ready for bulk production.įor industrial garments preparation, marker making is a very important chapter for highest usage of fabric and for lowest wastage of fabric. Sewing allowance and other measurements are also observed. Then the garments are compared with the approved sample. Here a little amount of fabric is cut and sewed in sewing section. This time also may vary according to the buyer’s recommendation.Īfter fabric relaxation, different tests are performed for maintaining the proper quality.Īfter testing the fabric, if it is seemed that, the fabric quality is ok, and then test cutting is done. But the minimum time of relaxation is twelve (12) hours. This time is varied from fabric to fabric. So relaxation is very necessary before cutting.įabric relaxation is performed for a certain period. So, if the dimension is became stabilized before cutting, no chance of strain in garments. But when the heat and pressure is being withdrawn, the shape may change. When the fabric is being processed in different finishing machines, it goes under certain heat and pressure to give it proper shape. Another cause of fabric relaxation is to maintain the dimensional stability of produced garments. This process is called fabric relaxation.
![cutting room floor band cutting room floor band](https://i.pinimg.com/564x/36/63/20/366320941c00779632f97cc205830df0.jpg)
But if we keep the fabric in normal temperature and pressure for a certain time, the fabric absorbs moisture from the atmosphere and regains its original nature. So moisture is removed from the fabric and it is not in actual condition. In dryer, stenter and compactor heat is applied on fabric. When the fabric comes from the dyeing and finishing, the fabric remains a slightly hot. Then the fabric is being stored for relaxation. Then mark it so that, these faulty portion of the fabric can be rejected during spreading and cutting. They check the fabric fully and find out the faults. For this, the fabric is being inspected by the quality inspector of the cutting section. Otherwise the end products will be faulty. When the fabrics are received from the dyeing and finishing section, it needs to be checked, because, faulty fabrics can be supplied from dyeing and finishing.